Skip to content
prod 352bb92
Browse

Tagged: ship

All Tags
ship
5 pages
5 related

Pages with this tag

Continuous Develop & Deploy

1

The everyday loop for a live CodeCanyon Laravel app — code, test locally, ship through the selected non-production target then production behind a database safety gate, and sync server-side changes back into git.

1 · Ship — code → test → deploy

2

The everyday deploy loop (WF-SHIP) — decide small vs big, work on develop, clear the pre-deploy database safety gate (Atlas lint — STOP on DS102/DS103), then run develop → selected non-production target → production and tag the release.

CodeCanyon workflows

3

Command router for a CodeCanyon Laravel app across its whole lifecycle — from first-time setup through daily operations like ship, vendor updates, hotfix, rollback, server sync, security, modules, and docs.

Code → test → ship

4

Terse deploy loop — local verify, pick Pattern A/B/C, run dep deploy or staging→production, post-deploy checks. Peeled from MWF1; teaching lives in the Ship playbook step.

Deploy commands

5

Ship, server-sync, and rollback command sequences at a glance — develop → staging → production behind the Atlas pre-deploy gate (STOP on DS102/DS103), plus the three rollback options.